Unit C1, Hutchison Telecom

We are proud to have erected one of the largest temporary roofs in Europe. The temporary roof afforded protection to the highly sensitive Telecommunications equipment within this huge building whilst much needed repairs were carried out to the existing roof. Due to the nature of this business, the integrity of our temporary roof was critical as any failure would have had devastating consequences. This vast roof measured 45m x 64m, with a total coverage area of 2880m2 and was completed by a 5 man team in just 15 days. To ensure the safety of our operatives, the roof was erected using Combisafe’s Runway Track System allowing the 25 bays to be erected safely from a stepped scaffold at the gable end and then simply rolled into their final position.